More about CO₂
Answers to your questions
You probably have some questions about what transport options we offer. You will find the answers to the most important topics here.
What form should CO2 transport take in the planned network?
How large should the network be?
Basically, the network will be planned in a demand-oriented and future-proof manner. On the one hand, we will take into account the reported needs of the users, as well as the results of studies and especially the results of the national carbon management strategy. Initially, we envisage a north-south connection from Wilhelmshaven to the Swiss border as well as connections to the Netherlands (Rotterdam) and Belgium (Antwerp/Zeebrügge) and a development of the industrial regions in eastern Germany (e.g. Leipzig/Leuna) and Bavaria (e.g. Ingolstadt).
Do you use old natural gas pipelines?
Can I buy and sell CO2 through OGE?
As an infrastructure operator, OGE exclusively markets transport capacities and is not active in commodities in any transport medium. For the commodity sector, OGE has teamed up with strong value chain partners.
Why should I have CO2 transported via pipelines and not through other means of transportation?
Transport infrastructure is needed for transportation to both, storage sites and to ultimate further utilization of CO2. The possible means of transport are truck, rail or ship transport as well as pipeline transportation. Here though, truck and rail transport are practical only for small quantities and short distances, while ships and pipelines are also suitable for larger volumes and greater distances. Pipeline transportation, however, offers a cost advantage for high capacities. Hence, in the long term, pipeline infrastructure has a task to connect particularly the major industrial locations where CO2 occurs as process emissions and those where CO2 is required as a raw material.15, 16
Why should I register my CO2 transportation requirements with OGE? Whom can I contact?
OGE operates the biggest gas transmission grid in Germany with around 12,000 km of pipelines. It has many years of experience as an infrastructure operator, as well as excellent know-how in pipeline construction and the transport business. Furthermore, OGE has teamed up with strong partners for CO2 infrastructure operation. Please feel free to contact us with your transport request or register on HyCo-Connect.
I have a demand for CO2. Where does it come from?
I would like to have CO2 removed. Where does it go?
Links
Carbon dioxide within German DVGW standards: C 260 (A) specifies the quality of CO2 and CO2 streams, whereas C463 (A) covers the design and construction of CO2 steel pipelines. C466 (A) deals with the operation and maintenance of CO2 steel pipelines. C 491 (A) is available as a technical rule for systems for CO2 Transport. The detailed regulatory framework is available in the member area of the DVGW website or can be bought via the following link: DVGW-Regelwerk Gas/Kohlenstoffdioxid
Sources
15Deutsche Energie-Agentur GmbH (ed.) (dena, 2021). “dena-Leitstudie Aufbruch Klimaneutralität”, p. 224
16Ministry of Economic Affairs, Innovation, Digitalisation and Energy of the State of North Rhine-Westphalia (ed.). (2021). Kohlenstoff kann Klimaschutz - Carbon Management Strategie Nordrhein-Westfalen, p. 49